A well-known contractor's cost estimate: tricks, double counting and the subliminal 25th frame

Why the mark-up hides in every line item and how an estimator defends a fair price.

A well-known contractor's cost estimate: tricks, double counting and the subliminal 25th frame

There are plenty of programs for cost estimating: GRAND-Smeta, Smeta.RU, Turbo-Smeta, WinSmeta, Baza-Smeta, RIK-Smeta, 1C and, finally, good old Excel. For all their variety, for a contractor these programs always come down to one thing. Maximum profit. The mark-up, like a subliminal 25th frame, will be in every line: labour, materials, delivery, equipment, unloading, clean-up, plus all kinds of coefficients for complexity, cramped conditions and remoteness.

As a rule, commercial estimates do not contain the coefficients and rates used in estimates for public contracts. In exceptional cases, working conditions or a discount can be taken into account by agreement with the client. So the main figures in a commercial estimate will be the quantity and the unit rate.

A mark-up on materials and equipment that the contractor does not make itself is acceptable within the limits of the tax burden. There is no point buying materials at an inflated price if you can buy them directly from the supplier. However, you should only take procurement away from the contractor if you have a competent buyer, or if you are buying large volumes with a personal discount. Otherwise construction will take longer.

The price of the work is the contractor's subjective assessment of its own specialists' professional level. To check whether the prices proposed for the work are reasonable, you need not only to request alternative quotes, but also to check the qualifications of the proposed specialists carefully.

Acting as owner's representative on a large country property, I had to check the estimates of a well-known landscaping contractor. And despite the recommended firm's track record and awards, the estimates looked appalling. Not in terms of layout or arithmetic. But as a combination of tricks, double counting and outright fraud.

Our work with this contractor was over before it had even begun. At the very first defence of the estimates, it became clear to everyone that someone else would be doing the landscaping.

The professional estimators on my team can substantially reduce the estimated cost, argue and defend their position in an open dialogue with the contractor, and secure a fair price for the client.

I always look for contractors who openly show their margin on a project. It is a sign of professionalism and respect for the client. Unfortunately, such contractors are extremely rare. Fortunately, we know how to find them.

Mark-up like a subliminal 25th frame in every line of the estimateLabour, materials, delivery, equipment, unloading, clean-up and coefficients for complexity, cramped conditions and remoteness: there is a mark-up sitting in every line of a commercial estimate.ITEMQUANTITYUNIT RATEMARK-UP Labour Materials Delivery Equipment Unloading CleaningFactors: complexity, cramped site,remoteness
Mark-up like a subliminal 25th frame in every line of the estimateLabour, materials, delivery, equipment, unloading, clean-up and coefficients for complexity, cramped conditions and remoteness: there is a mark-up sitting in every line of a commercial estimate.ITEMQUANTITYAND RATEMARK-UP Labour Materials Delivery Equipment Unloading CleaningFactors: complexity,cramped site, remoteness

Preparing and checking cost estimates

More from the journal

[ Contacts ]

discuss your project

+7 (989) 577-75-77

Elena, office administrator

info@endovitckii.ru

Office2 Krylatskaya Street, Moscow
The administrative building on the Rowing Canal, gallery, floor 3, offices 10-12.
Free parking. Passes are arranged through the office administrator.

The office administrator will reply during working hours. If it is urgent, please call.