Scroll down: on the slope by the pond a foundation pit and a cast-in-situ slab appear, the lower-floor walls rise, then come the floor slab with the garage and the cantilever over the slope, the glass and the green roof, and finally the garden and the deck over the water.

- [01]plot
Slope by the pond
The new building goes up next to the main house, which sets its style. The plot slopes down to the pond, so the lower floor is set into the slope.
- [02]stage 1
Excavation and foundations
First a pit is dug in the slope and a cast-in-situ foundation is poured. According to the room schedule, the lower floor, together with the garden and the terrace, covers 1,135.4 m².
- [03]stage 2
Lower floor
Cast-in-situ walls and columns enclose a 309 m² exhibition hall, a banqueting hall with a fireplace area, a gym, a massage room and a manicure room. Space for a garden is left in the middle.
- [04]stage 3
Floor slab and garage
A floor slab goes in over the halls, with a four-car garage on the upper level. A passage with a platform lift links the new building to the main house.
- [05]stage 4
Cantilever over the slope
The building gets a cantilevered projection towards the pond: in the rendering it is a white slab frame with a fireplace, projecting over the slope. In front of the halls is a 174.5 m² terrace.
- [06]stage 5
Glass and green roof
The facades facing the pond are closed in with panoramic glazing, and a glass roof is built over the garden. The roof of the building is green and accessible, with a glass balustrade.
- [07]stage 6
Garden and building services
The building services of the house will be controlled by artificial intelligence. Inside grows a garden with a red maple, and slab steps and a deck over the pond lead down to the water.
The model is based on the project materials on the company website: the lower floor and garage follow the 1:200 concept plan with its room schedule, and the appearance follows the renderings. The terrain, the position on the plot, the main house, the location of the garage and cantilever, and the heights are shown schematically, as the published materials do not include them. The construction sequence is the usual one for a cast-in-situ concrete house.
Design and construction of a 1,500 m² house: a second building for the main house, a cantilever over the pond and an accessible green roof.
Design and construction of a modern 1,500 m² house in Odintsovo District.
The new building is conceived as a second block of the existing main house, which sets the reference for its exterior architectural style. A cast-in-situ foundation, two storeys with a cantilevered projection over the pond, an accessible green roof and a garage. We plan to create unique ergonomics for the interior and for the landscaping around the building, and to use AI to control the building services. The building is scheduled for commissioning in 2025.
Photos of the building
Other projects

photo3DMain house of the Gagarin - P. P. Kuvshinnikov - Popov estate, with its wing
1 Yelokhovsky Proyezd, bldg 2, Moscow

photo3DHouse of the Sarepta Evangelical Society: museum
11 Spartakovskaya Street, Moscow

photo3DChambers in Kadashevskaya Sloboda
10 1st Kadashevsky Lane, bldg 2, Moscow
discuss your project
+7 (989) 577-75-77Elena, office administrator
info@endovitckii.ruOffice2 Krylatskaya Street, Moscow
The administrative building on the Rowing Canal, gallery, floor 3, offices 10-12.
Free parking. Passes are arranged through the office administrator.