Pre-trial dispute settlement and damage prevention

In music, a mediator (that is what Russians call a plectrum) is a small plate used to draw sound from the strings of a guitar. It lets you play faster and get a sharper, cleaner sound than playing with your fingers.
A mediator in construction is a similar tool: it turns the cacophony of a conflict into a harmonious melody that is easy on the ears of the parties to the dispute. The golden rule: a mediator takes no one's side and makes no decisions for the parties, but organises a constructive dialogue between them. In my case, that dialogue always ends in peace. Well, OK, not always. Sometimes the arseholes who cannot hear my melody have to be replaced. A pity this only applies to contractors.
Court is the last resort
Going to court is the last resort, for situations where every attempt to settle the conflict has failed. The emotions of the people involved are often the main obstacle to finding the right solution. Seeing the heart of the problem straight away is half the battle. Settling the dispute before the court hands down its judgment is the other half.
But the coolest thing of all is to see the real cause of what happened and remove it. Preventing a similar situation from arising in future is the height of mastery.
Case study
A conflict between a client and a contractor over the glazing of a winter garden on the roof of a luxury building. The contractor who had taken on the job went bankrupt. His subcontractor, left unpaid, went into deep freeze. Meanwhile the winter garden leaks, filling the client's heart with disappointment and rage. Threats of physical violence and criminal prosecution fill the air. A painstaking hunt is on for someone to blame among the engineering staff. None of the contractors will answer the phone.
After a little analysis of the situation, I managed to track down the subcontractor and look at things through his eyes. I had heard the client's emotional version many times already. In the end, the parties signed a new deal directly, and the engineers returned to the site. I advised handing the matter of taking part in the contractor's bankruptcy proceedings over to the lawyers and, first and foremost, making sure the subcontractor was paid for the work already done. This turned out to be the cheapest way to solve the problem. Bringing in a new contractor would have raised the cost of the project by at least a third and reset the warranty periods on part of the structures to zero.
Three service blocks
discuss your project
+7 (989) 577-75-77Elena, office administrator
info@endovitckii.ruOffice2 Krylatskaya Street, Moscow
The administrative building on the Rowing Canal, gallery, floor 3, offices 10-12.
Free parking. Passes are arranged through the office administrator.