Skip to content
General design ·Interior design project, concept design and protected features project03
[ General design ]

Interior design project, concept design and protected features project

Interior design project, concept design and protected features project

Every building is born in the client's imagination, drawing on their experience, their trained eye, their taste and their needs. First comes the design of the future building: a picture that has yet to be brought to life. With restoration, however, you have to fit your fantasies into the architectural setting of centuries past.

The most important stage of adaptation is the functional zoning of the building, which is needed to produce the concept design and to revise the protected features project. These stages are interlinked and are carried out jointly by the interior architect and the restoration architect.

The designer and the engineers

For the engineers who design the building services, the interior designer is the main source of input data. A socket will be wherever the design puts a lamp, and a ventilation duct will not suddenly pop up on the ceiling to the client's surprise. The construction design has to be a technical copy of the interior design project. That is exactly why it is so important to synchronise the work of the designers with that of the services engineers. On my first projects I often overlooked these subtleties, and the whole team of engineers sat twiddling their thumbs, waiting for the interior design project to be finished. And that is precisely the stage where the client is at their most hands-on. Which makes its timing unpredictable.

After a long and painful labour, a mandatory annex to the designer's contract was born, fixing deadlines for each building services section by which input data had to reach the engineers. This brought the different teams into sync and saved a huge amount of time. At various stages of the interior design project it becomes possible to issue briefs for the building services sections, so the design team can work without downtime or rework. Being able to use data the moment it appears is a priceless skill that keeps you within the agreed schedule.

Schedule: the designer and the engineersThe engineers used to wait for the interior design project to be finished. With an annex to the designer's contract that fixes deadlines for issuing input data for each building services section, briefs go out as soon as they are ready and the design team works without downtime.IN EARLY PROJECTS Interior designElectrical systems Heating, ventilation Water supply Low-voltageengineers wait for the interior design to be finishedWITH AN ANNEX TO THE DESIGNER'S CONTRACT Interior designElectrical systems Heating, ventilation Water supply Low-voltage section briefs go out as the design progresses, with no downtimeor rework
Schedule: the designer and the engineersThe engineers used to wait for the interior design project to be finished. With an annex to the designer's contract that fixes deadlines for issuing input data for each building services section, briefs go out as soon as they are ready and the design team works without downtime.IN EARLY PROJECTS Interior designElectrical systems Heating,ventilation Water supply Low-voltageengineers wait for the interiordesign to be finishedWITH AN ANNEX TO THE DESIGNER'S CONTRACT Interior designElectrical systems Heating,ventilation Water supply Low-voltage section briefs go out as the design progresses, withno downtime or rework

Three service blocks

[ Contacts ]

discuss your project

+7 (989) 577-75-77

Elena, office administrator

info@endovitckii.ru

Office2 Krylatskaya Street, Moscow
The administrative building on the Rowing Canal, gallery, floor 3, offices 10-12.
Free parking. Passes are arranged through the office administrator.

The office administrator will reply during working hours. If it is urgent, please call.