What lies inside the walls
Choose a section: the house turns transparent, the floors move apart and the system shows up in red. The sections are the same as in Vadim's cost estimate for a real building.
Outside, a listed building
The facade, the classical order and the roof stay exactly as the law protects them. The new services run inside and cannot be seen on the facade.
Electrical systems
Power equipment, electric lighting, lightning protection.
- Main switchboard (MSB)
- Floor distribution boards and cable trays
- Lighting and sockets
- Lightning protection
Ventilation and air conditioning
General ventilation and air conditioning, smoke control ventilation.
- Supply and extract air handling unit
- Ductwork and grilles
- Roof fans and smoke extraction
Heating and heating substation
Heating and heat supply system, individual heating substation.
- Individual heating substation
- Radiators under the windows
- Heating risers
Water supply and drainage
Internal water supply and drainage systems, fire-fighting water supply.
- Water meter assembly and pumps
- Water supply and drainage risers
- Fire hose reels
Low-voltage systems and security
Fire alarm and evacuation warning, local network, access control, CCTV.
- Fire detectors and evacuation alarms
- CCTV and access control
- LAN cabinet

This part of the design turns the restoration and adaptation solutions approved by the heritage authority into detailed drawings and sections. Working documentation issued for construction is the contractor's only point of reference on site. I often come across perfectly conscientious restorers who sell the client only the restoration and adaptation design, since nothing more is needed to get a restoration permit. But restoring a building, let alone adapting it to modern services, without working documentation is as impossible as taking your trousers off without using your hands. What is more, most restorers bring in subcontractors to develop the building services sections. Because they are “about beauty”, not “about function”. As a result, the client has to pay different teams for two stages of design. Stage P (design documentation) for the heritage authority, and Stage RD (working documentation) for the builders on site.
Before I came into restoration, I spent almost 10 years designing, building and operating utility networks for large housing developments. That gave me a concrete advantage over other restorers on their own turf. I knew that my competitors came, at best, from an architectural background and, at worst, were former heritage authority officials relying on their administrative experience. The restorers' Achilles heel was my main strength. I not only knew how to glue the wings back on a cherub, but also knew perfectly well how to make a building comfortable from an engineering point of view.
Single-stage design
Today we offer clients single-stage design. Stage P with the full detail of working docs, in which the sections for the heritage authority are topped up with the working drawings the builders need. This cuts the cost and time of design by almost a third.
Three service blocks
discuss your project
+7 (989) 577-75-77Elena, office administrator
info@endovitckii.ruOffice2 Krylatskaya Street, Moscow
The administrative building on the Rowing Canal, gallery, floor 3, offices 10-12.
Free parking. Passes are arranged through the office administrator.