The way you connect to utility networks has a direct impact on the project's budget and timeline. Connecting to an existing system or building your own generation is one of the main questions when choosing a site to build on. Whether a connection is possible depends on the necessary infrastructure being nearby. The planned consumption of each resource is calculated by engineers at the design stage. And it forms the basis of the application for a utility connection. The choice of resource should be based on an analysis of the connection costs and the running costs at the tariff afterwards.
If there is no sewerage, we put in a septic tank; no mains water, we drill an artesian borehole with water treatment; no electricity, we use propane, solar panels and heat pumps. There is always a way out, and I will be glad to help you through this stage without the stress.
Case study
I once set up a company founded on faith in ever-rising utility tariffs for water and sewerage. And in the end I built a corporate water utility for PIK Group, starting with a single borehole. My experience in this field is packed with unique cases, enough to fill a decent-sized book. If you have questions about connections, call us. You won't need to do anything else.
Three service blocks
discuss your project
+7 (989) 577-75-77Elena, office administrator
info@endovitckii.ruOffice2 Krylatskaya Street, Moscow
The administrative building on the Rowing Canal, gallery, floor 3, offices 10-12.
Free parking. Passes are arranged through the office administrator.